
One of the concerns in the transition to Core i7-based platforms was how Intel's new chips would fare with DDR3 memory exceeding 1.65V. Early reports warned that the higher voltage kits might potentially pose a risk to the processor, prompting memory makers to focus on triple-channel kits with lower voltage than their dual-channel counterparts. But voltage restrictions could become even less of a concern now that Elpida has completed its development of a 50nm process DDR3 SDRAM.
Elpida claims its new DRAM features the lowest power consumption in the industry, requiring as little as 1.2V, making them good candidates for eco-conscious server environments and data centers. The 2.5Gbps-capable chips can also operate at 1.5V and Elpida says initial applications will include high-end desktops.
Mass production of the 50nm chips is scheduled to being in Q1 2009.

Image Credit: Elpida
Comments are closed on this article
Links:
[1] http://www.maximumpc.com/user/paul_lilly
[2] http://www.elpida.com/en/news/2008/11-26.html
[3] http://www.maximumpc.com/article/news/elpida_announces_powerefficient_2gbps_highspeed_ddr3_memory
[4] http://www.maximumpc.com/article/news/holy_moly_mushkin_releases_16_triplechannel_ddr3_kits
[5] http://www.maximumpc.com/article/news/crucial_brings_ballistix_led_light_show_ddr3_memory_but_will_it_play_nice_with_core_i7
[6] http://www.maximumpc.com/tags/50nm
[7] http://www.maximumpc.com/tags/buildapc
[8] http://www.maximumpc.com/tags/ddr3
[9] http://www.maximumpc.com/tags/dram
[10] http://www.maximumpc.com/tags/elpida
[11] http://www.maximumpc.com/tags/memory
[12] http://www.maximumpc.com/articles/news