Is Christmas Coming Early?

Haipyng is reporting that the originally scheduled launch of Nehalem based Bloomfield processors will be moved up to September. Imagine that, a hardware launch ahead of schedule! The X58 chipsets will launch along with it..

Some early tests of samples of Nehalem show it beating out current processors by 20 to 30 percent. It appears to like overclocking as well with some overclocking tests going to almost 1Ghz over stock. Nehalem ditches the traditional front-side bus (FSB), and instead uses an external multiplier to control the link between CPU core, memory controller, and north-bridge.

This is only going to further mash AMDs toes as their next CPU, Shanghai, doesn’t look promising for catching up to Intel. Unless AMD has a hat trick waiting, we’ll have to wait until San Paolo and Magny-Cours come out in 2010 to see if AMD can catch up. A year and a half is a long time and a lot can happen in the CPU world. With Nehalem looking to come out early, Intel stretches its lead.

Is Nehalem seductive enough to get you to upgrade?

(Image Credit: Based on image from BAD RABBIT INC)

Around the web